The Alaska Pipeline's Permafrost Challenge
Clip: Season 18 | 37s
The Alaska Pipeline could not be buried under the Arctic tundra.
The oilmen planned to build the Alaska pipeline the same way they'd built every other pipeline in the world -- dig a ditch and bury it. This would not work in the arctic. Beneath a thin, insulating cover of tundra and vegetation, much of Alaska sits on permanently frozen ground called permafrost. In some places, it's mostly gravel, but in others it's mostly ice.
Problems with Closed Captions? Closed Captioning Feedback
Problems with Closed Captions? Closed Captioning Feedback
Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Carlisle Companies. Major funding by the Alfred P. Sloan Foundation.

The Alaska Pipeline's Permafrost Challenge
Clip: Season 18 | 37s
The oilmen planned to build the Alaska pipeline the same way they'd built every other pipeline in the world -- dig a ditch and bury it. This would not work in the arctic. Beneath a thin, insulating cover of tundra and vegetation, much of Alaska sits on permanently frozen ground called permafrost. In some places, it's mostly gravel, but in others it's mostly ice.
Problems with Closed Captions? Closed Captioning Feedback
How to Watch American Experience
American Experience is available to stream on pbs.org and the free PBS App, available on iPhone, Apple TV, Android TV, Android smartphones, Amazon Fire TV, Amazon Fire Tablet, Roku, Samsung Smart TV, and Vizio.

When is a photo an act of resistance?
For families that just decades earlier were torn apart by chattel slavery, being photographed together was proof of their resilience.Providing Support for PBS.org
Learn Moreabout PBS online sponsorshipThe Scale and Cost of the Alaska Pipeline
Clip: S18 | 1m 57s | The one thing that was not in short supply was workers hoping to cash in on the project. (1m 57s)
Clip: S18 | 1m 12s | After oil was struck in Alaska's Prudhoe Bay, companies agreed to build a pipeline. (1m 12s)
Clip: S18 | 1m 23s | Alyeska suffered its first scandal when a subcontractor falsified weld x-rays. (1m 23s)
Construction Begins on the Alaska Pipeline
Clip: S18 | 40s | Construction of the Alaska Pipeline began on March 27, 1975. (40s)
Building a Supply Road for the Pipeline
Clip: S18 | 1m 9s | On April 29, 1974, construction began on a haul road for transporting pipeline materials. (1m 9s)
Alaska Pipeline: Thompson Pass
Clip: S18 | 2m 53s | One of the biggest challenges in the Alaska Pipeline's construction was Thompson Pass. (2m 53s)
The Alaska Pipeline's Permafrost Challenge
Clip: S18 | 37s | The Alaska Pipeline could not be buried under the Arctic tundra. (37s)
Clip: S18 | 1m 19s | The last piece of the pipeline was laid at Atigun Pass, the highest point on the line. (1m 19s)
Preview: S18 Ep12 | 30s | Annie Oakley won fame and fortune as the little lady from Ohio who never missed a shot. (30s)
Clip: S18 Ep7 | 13m 4s | The first chapter of American Experience's "Jesse James." (13m 4s)
Preview: S18 Ep7 | 30s | Airs Tuesday, May 7, 2013 at 8:00 p.m. ET/PT. Check your local listings. (30s)
Video has Closed Captions
Clip: S18 Ep12 | 9m 47s | The first chapter of American Experience's "Annie Oakley," broadcasting January 31. (9m 47s)
Providing Support for PBS.org
Learn Moreabout PBS online sponsorshipSupport for PBS provided by:
Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Carlisle Companies. Major funding by the Alfred P. Sloan Foundation.